Installing Underfloor Heating with Vinyl Flooring
When installing Vinyl or LVT floor on top the Wunda Rapid Response® system you will first need to prime the boards with an approved primer and then pour a thin layer of levelling compound (10mm) on top of the pipes and panel. Then install the floor finish on top of that.
This is necessary since LVT and vinyl finishes are often quite thin.
While the levelling compound or primer is not provided by Wunda, it can be sourced from local merchants or online.
The approved compounds are:
- ‘Ultra ProLevel Ultimate’, when primed using ‘Ultra prime it multi surface primer’.
- ‘Mapei Ultraplan Renovation Screed’ when primed with ‘Mapei Eco Prim Grip’
The aluminium of all unused pipe channel’s must be cut to expose the empty channel, ready for filling with the approved levelling compound.
Wunda’s Water Underfloor Heating Systems