Project Pricing

Rapid Response® is a cost effective way of increasing the value of your home

A bright conservatory with underfloor heating laid under laminate flooring

Rear Extensions

Many of our customers install Rapid Response® in their ground floor extensions to create inviting family open spaces with unparalleled comfort.


Projects like this 15sqm extension average from

£554 exc. VAT

Hallway with wooden flooring under which our heating system is installed

Ground Floor

Often customers want the On Demand comfort the moment they step through their front door, so they fit Rapid Response® all across the ground floor!


Projects like this 77sqm renovation average from

£1,914 exc. VAT

Beautiful neutral coloured bedroom with a Wunda Smart Heating system installed

Two Floor Renovation

When you’re doing a renovation or extension project, it’s important to give a thought to your resale market. Homes fitted with Rapid Response® are sought after and valued higher.


Projects like this two-floor 127sqm renovation average from

£3,498 exc. VAT

Floor heating

Email your plans for a fast FREE no obligation estimate to: plans@wundagroup.com

Request an estimate

Your WundaFloor Questions

We recommend having regular servicing to maintain an efficient system, when you have the boiler serviced for example to check inhibitor levels are still ok, no air locks in the system causing poor performance. With regular preventative maintenance, you will have no problems of breakdown

A Rapid Response® floor heating system produces heat in as little as 30 minutes because it has a level of controllability not seen before in under floor heating. Combined with our Home Heating Controls it can be turned on, off, up, down in individual areas of the home at the touch of a button on your smart phone, Ipad or laptop from wherever

The Rapid Response® heating system is a water-based floor heating system that uses low-temperature warm water to heat rooms evenly and quickly. Input temperatures can be as low as 45°C, using half the energy required to heat a radiator at 70-90°C.

This combined with the on demand nature of The Rapid Response® heating system, allows users to only heat the rooms they’re using, and not have to leave the heating on all the time like old traditional screed systems which took days to heat and cool.

 

The responsive use and lower energy requirements to run the Rapid Response® heating system make it a low carbon solution that’s compatible with current heating technology like gas/oil boilers; as well as working efficiently with alternative fuels of the future like hydrogen boilers and air & ground source heat pumps.

Rapid Response® on demand heat can reach desired temperatures in as little as 30 minutes.

This is thanks to all the work done in developing the Rapid Response® aluminium that’s used in both the board and pipe.

No, the spray contains no carcinogens and is CFC free.

Not at all! Rapid Response® boards are retro-fitted to the existing floor using our Wunda adhesive spray.

This saves time & cost in the installation as well as avoids any potential risks in digging up decades-old concrete substrates.

Rapid Response® is available in 16mm & 20mm profile boards.

The Rapid Response® boards come in 3 densities of EPS (Expanded Polystyrene), our Premium+ range is our strongest and most insulative board.

We got it tested at the University of Salford by their UKAS accredited product testing lab and got the following results back:

 

20mm of Rapid Response® has an R-value of 0.447 (+/- 2%)

16mm of Rapid Response® an R-value of 0.379 (+/- 2.8%)

 

So in comparison to a system using just radiators, it’s superior in insulation and will heat more sufficiently with better energy efficiency.

Wunda only provides pipe which is 100% leak proof. By using a 5 layered pipe comprised of an EVOH barrier to prevent oxygen ingress and rusting the aluminium core as well as Pert for superior flexibility.

We also pressurise the pipe at the point of manufacture, so you know instantly before putting it in the floor whether the product’s been comprised in transit. In over 14 years of manufacturing and supplying floor heating, we’ve never had a leak. Ever.

Thanks to retro-fit systems like Rapid Response® 100m2 can be laid in just two days using quick drying Wunda Spray adhesive. It’s no longer a case of digging all your floors up, simply take up your carpet, prepare your sub-floor and lay a retro-fit system. 