Install Process
First the old damaged vinyl was removed to reveal the concrete floor underneath. After removing any debris from the concrete floor, a pipe and board layout plan provided by Wunda was followed, and the Rapid Response Overfloor® boards were laid down using Wunda’s Rapid Bond adhesive spray. After laying the boards the pipe was installed.
Once the boards and the pipe was laid duo boards were placed over the Rapid Response boards ready for the chosen Vinyl floor finish.
The Manifold was installed, pressure tested and connected to the boiler by a professional plumber.
To control the system the Great House owners chose to have WundaSmart controls installed.